The Old Pike. Thomas B. Searight
part of the Cumberland Road which lies within the limits of said State shall have been put in that state of repair contemplated by the act of Congress, and the act of Assembly of the State of Maryland, agreeing to receive the road and to keep it in repair; that they will with great pleasure report the road to the Governor and Council the moment they can with propriety do so. And they beg leave to represent that they feel authorized to say that the Governor and Council will, with great pleasure, authorize them to receive the road whenever it shall be put in that condition which would justify the State in accepting it. They further represent that the road has not yet been put in that condition that would justify them in advising the State to receive it. On some parts of the road no more than three and a half inches of metal has been put, and it is evident that this covering will be totally insufficient to preserve it in a fit state for use under the heavy travel which is constantly passing over it. The bridges also, throughout the whole distance, remain in a ruinous and dilapidated condition. They further respectfully represent that the new location from Cumberland, through the narrows of Wills creek and along Braddock’s run, a distance of upwards of six miles, has had but three and a half inches of metal upon it; and the bridge over Wills creek and the bridges over Braddock’s run were to be permanent stone structures, by the act of Assembly of Maryland, authorizing the President to change the location of the road. The undersigned are also advised that it is contemplated by the superintendent to put up wooden structures for bridges, in lieu of the stone bridges required by the act of Assembly of Maryland, authorizing the change in the location of the road, which would be in direct violation of that act. They further represent that the floors of wooden bridges must be removed every two or three years, and the whole structure of the bridges themselves must be built every twenty or twenty-five years.
Under these circumstances it would be impossible for the undersigned, in the discharge of their duty, to recommend to the State the acceptance of the road. And they would most earnestly but respectfully urge upon Congress the propriety of making such an appropriation as will be sufficient to complete the repairs on the old road, and to finish the new location in a substantial manner, as contemplated and required by the act of the Legislature of Maryland. The undersigned will not undertake to prescribe the sum which may be necessary for this purpose; but, to satisfy your honorable bodies that they are disposed to go as far as the faithful discharge of their duty will permit, they hereby pledge themselves that so soon as Congress shall make an appropriation of so much money as may be estimated by the department as necessary for the completion of the repairs of the old road, and the finishing of the road on the new location, together with the construction of permanent stone bridges, they will forthwith report to the Governor and Council the state of the road, and recommend that the State receive such part of the road as may be completed, and to collect tolls on it to keep it in repair, thereby relieving the United States from any further expense for repairs on such part. They further beg leave most respectfully to submit to the wisdom of your honorable bodies to determine whether it will be better to make the necessary appropriation to enable them to recommend the road as in a fit condition to be received by the State, and thus relieve the government from any further burden, or to let it remain in its present state, subject to appropriations for its preservation, as heretofore.
JOHN HOYE,
MESHECK FROST,
Commissioners of the State of Maryland.
On April 1, 1835, Pennsylvania accepted the road in the following brief terms, embodied in the third section of an act of her legislature of that date: “The surrender by the United States of so much of the Cumberland Road as lies within the State of Pennsylvania is hereby accepted by this State, and the commissioners to be appointed under this act are authorized to erect toll gates on the whole or any part of said road, at such time as they may deem it expedient to do so.”
Maryland, Virginia, and Ohio also accepted the road, and thenceforth it was, and remains under the control of the several States through which it passes.
CHAPTER IX.
Plan of Repairs—The Macadam System adopted—Mr. Stockton offers his services—Capt. Delafield made Superintendent—The Road in a bad condition—Permission asked to deviate from instructions, and refused—Capt. Giesey lifted the old road bed indiscriminately—First defects to be remedied—Lieut. Mansfield at Uniontown—Plan emphasized in notices for contracts—Free passage for water a first consideration.
Engineer Department,
Washington, July 23, 1832.
Lt. J. K. F. Mansfield, Corps of Engineers:
Sir: By direction of the Secretary of War, you have been assigned, temporarily, to the superintendence of the repairs of the Cumberland Road east of the Ohio river; and in the discharge of your duties in this capacity, you will be governed by the following instructions:
1st. Respecting the parts to be repaired. The extreme limits within which your operations will be confined are, the point of intersection of the road with the western boundary line of the State of Pennsylvania, and Cumberland, in the State of Maryland; the dividing line between these States will be considered as dividing the line of the road to be repaired into two divisions, and the division within the State of Pennsylvania will be subdivided into six equal sections, and that within the State of Maryland, into two; then, having made a thorough examination of each of these sections, with a view to make yourself acquainted with their exact condition, you will classify them in the order of their condition, placing the worst first, the next worst second, and so on, making the best the last. You will then make an estimate for the repairs of each of these sections, to ascertain how far the appropriation, which is one hundred and fifty thousand dollars, will go toward repairing the whole road. Separate contracts will then be made for executing the repairs, commencing with No. 1, and passing regularly through the sections, as classified, to the best section; and these repairs will be prosecuted with as much despatch as the nature of the case will allow. Should you deem it advisable, in letting out these sections, to retain any portion of them which may seem to require but slight repairs, and which repairs could be executed with greater economy by having overseers and laborers to act under your immediate direction, you are at liberty to do so, bearing in mind, however, that whenever the repairs of the road can be made with equal economy, it is the wish of the department that they should be made by contract. As soon as one or more of these sections are finished, you will notify the commissioners appointed to receive this road by the laws of Pennsylvania and Maryland, approved, that of the former on the 4th day of April, 1831, and that of the latter on the 4th day of January, 1832, that these sections are ready to be turned over to the State, and you will accordingly turn them over.
2d. Respecting the mode of repairs. In order to insure efficient and permanent repairs, they are to be made on that which is called the Macadam system; that is to say, the pavement of the old road must be entirely broken up, and the stones removed from the road; the bed of which must then be raked smooth, and made nearly flat, having a rise of not more than three inches from the side to the center, in a road thirty feet wide; the ditches on each side of the road, and the drains leading from them, are to be so constructed that the water cannot stand at a higher level than that which is eighteen inches below the lowest part of the surface of the road; and, in all cases, when it is practicable, the drains should be adjusted in such a manner as to lead the water entirely from the side ditches. The culverts are to be cleared out, and so adjusted as to allow the free passage of all water that may tend to cross the road.
Having thus formed the bed of the road, cleaned out the ditches and culverts, and adjusted the side drains, the stone, reduced to a size not exceeding four ounces in weight, must be spread on with shovels, and raked smooth. The old material should be used only when it is of sufficient hardness, and no clay or sand must be mixed with the stone.
In replacing the covering of stone, it will be found best to lay it on in strata of about three inches thick, admitting the travel for a short interval on each layer, and interposing such obstructions from time to time as will insure an equal travel over every portion of the road; taking care to keep persons in constant attendance