equipment rating requirements. The specification for a particular piece of equipment can be updated from project to project with some minor changes. It is the data sheet that changes in a big way as the application and ratings may be completely different from project to project.

      From project to project, try to maintain the same ID number for the same design product, if the project permits it. For instance:

       Specification and data sheet, respectively, for MCCs on project ABC: ABC – xxx – TS31 – DS31

       Specification and data sheet, respectively, for MCCs on project XYZ: XYZ – xxx – TS31 – DS31

      Try to group the documents for the type of equipment and services. Leave some gaps as there are differences in scope from project to project. When you are dealing with equipment like MCCs located in various different parts of a plant, write a common spec with several data sheets added to it for different areas.

      Here is a list of specifications from a recent project in Minnesota on a 55 MW power plant using turkey litter as fuel:

      1 Electrical contribution to mechanical engineers' specifications.

TS01 Electrical requirements for mechanical equipment
TS02 Electrical requirements for 480 V motors up to 200 kW
TS03 Electrical requirements for medium voltage (MV) motors over 200 kW

      1 Main power distribution

TS11 Switchyard equipment and hardware
TS13 Large transformers
TS14 Standby diesel generator
TS15 Relay protection panels
TS17 13.8 kV transformers
TS21 13.8 kV switchgear

      1 Plant equipment

TS23 MV motor controllers
TS24 MV VFDs
TS31 480 V MCCs
TS32 480 V VFDs
TS33 Unit substations and low voltage (LV) switchgear
TS35 Station battery and chargers
TS36 Uninterruptible power supply (UPS) equipment and panels
TS37 Rigid bus ducts
TS38 Cable bus ducts
TS39 Lighting and distribution panels
TS40 Power and control cables
TS41 Plant heat tracing panels and hardware

      1 Services and plant installation

TS43 Plant CCTV
TS44 Plant public address
TS45 Plant telephones and data
TS51 Plant fire detection and suppression system
TS52 Plant heat tracing
TS54 Overhead distribution lines
TS55 Switchyard installation
TS57 Plant installation

       Example: 20 PU 007; Area 20; PUmp sequence number: 007. The pump number is also given to the associated motor.

      The plant process areas may be given the specific area designations:

       00: For a general site, including the main substation

       10: Crushing

       20: Conveying

       30: Milling

       40: Flotation, etc.

      For the equipment, assign intuitive designations as follows:

       PU, pump; SP, sump pump; TK, tank; CR, crane; AG, agitator; VF, vent fan; RF, roof fan; LP, lighting panel; HR, heater; CV, conveyor; TR, transformer; CY, cyclone; etc.

      The sequence is from 001 to 999. The sequence numbering may restart from 001 for each area.

      The numbers do not have to be consecutive. The sequence number 001 may start from the basement, 101 on the first level, etc., to better describe the equipment location.

      Be consistent and make sure the pumps are sequenced in pairs: 001/002, 103/104, the odd number is, for instance, on the left side approaching the motors.

      Cables are generally numbered and defined by the loads and not the MCC sources. Some companies insist that cable numbers include indications of the source (the MCC bucket) and the destination (load). Standardize control cables for the common hardware such as pushbuttons by using consistent cable C suffixes, programmable logic controller (PLC) connections. For instance, the cables for the pump 40 PU 003 are labeled:

       40 PU 003 P: For the motor power cable.

       40 PU 003 C1: For the control cable to PLC equipment.

       40 PU 003 C2: For the control cable to the Push Button station.

       40 PU 003 C3: For the control cable to the field level switch or other sensor.

      Make sure the numbering is consistent for all plant motors. This will allow for