continued, but the records available do not tell about anything of much interest for the next two or three years. Then in 1186–1187 a catastrophe occurred—the cathedral was again burnt. But this time the effects of the fire were much more disastrous than had been the case in 1114. So extensive was the destruction that the entire roofing, as well as the internal flat ceiling, was gone; and though we can glean no certain knowledge from documentary evidence, it appears probable that the eastern section of the building suffered more than any other, for whatever other causes may have aided in the wreck of this part—a weakness in the masonry, an insufficiency in the supports or abutments—the fall of such heavy timbers as those which must have formed the outer roof and inner ceiling of the chancel would in itself be sufficient to wreck the remainder.

      Whether the change in plan that now followed was really necessary because of the damage that had been done, or whether the fire provided a welcome opportunity by which new features might be introduced, we are not able to discover. It is sufficient that the chance was not lost, for in the eastern ambulatory of the cathedral church at Chichester is to be seen, as a result, one of the most truly beautiful examples of mediæval design that English architecture now possesses.

THE CLERESTORY PASSAGE, NAVE, SOUTH SIDE.

      In the nave some parts of the old limestone walls had been injured by the fall of the roofs; they were also seriously damaged by the beams that had been laid upon them, for these, after their fall, would continue to burn as they rested against those portions of walling which remained standing. It was no doubt by some such cause as this that the early clerestory was disfigured and partly destroyed. In either case, the old clerestory arcade of the twelfth century no longer remained as it was before; and though there were already stone vaults to the aisles of the nave before the fire occurred, yet they also disappeared and made way for newer ones. The outer roof over the triforium evidently shared the fate of the other coverings; and the arched abutment in the triforium, which acted as a support to this roof and the walling below the clerestory, now disappeared. It may be that this arching was not completely destroyed by the fire alone; no doubt some that remained was intentionally removed to prepare the way for the new work.

      

      The same bishop who had witnessed the completion of the earlier operations began with much enterprise to see about the reconstruction, but not the restoration, of what had been destroyed. Some portions were repaired, others rebuilt; but the greater part of the work now undertaken involved an entire change in the character of some of the principal features of the earlier scheme. In fact, this incident in the history of our subject gave "occasion to one of the most curious and interesting examples of the methods employed by the mediæval architects in the repairs of their buildings."2

      Having decided that they would, if possible, avoid all future risk of a similar catastrophe, a system of vaulting was adopted as the best solution of the problem—this involved necessarily a remodelling of the interior; and so, neglecting the Isle of Wight limestone and the Sussex sandstone, which at first had been the material used for the walling, the masons were directed to use stone of finer texture and smaller grain. It has been thought by some that this material was brought from Caen in Normandy. The same stone was used to re-face parts of the nave piers. And in addition Purbeck marble was selected instead of that which was to be found in Sussex.

      It is interesting to remember that the new choir of Canterbury had only been finished about three years before the fire occurred at Chichester. This work had been begun by William of Sens and finished by William the Englishman; and though it was so large an undertaking, it appears to have been commenced and completed between the years 1174 and 1184. This would very naturally exert some influence upon the building projects of a neighbouring see. Whether any of the actual craftsmen from Canterbury worked again at Chichester or not we cannot tell, but it is evident that the Kentish experience was of great help to Sussex in the new venture. When it had been decided how they should operate, it was natural that the covering of the building must be the first provision. This involved the repair of the shattered clerestory, and then they were free to proceed in other directions. Further than this we have no means of learning what method was followed in carrying on the new work; but it continued, so that in about twelve years the building was dedicated again.

HISTORICAL SECTION FROM WILLIS'S ARCHITECTURAL HISTORY. Original Elevation. Present Elevation. Two Bays of Retro-choir. (Scale 29'2 feet to 1 in.)

      There is nothing now to indicate that the provision of a vault had been intended by the original builders of these walls. This deficiency was met by the insertion of vaulting shafts and the addition of external buttressing; for as the pressure of the flat wooden roof was exerted for the most part vertically upon its supports, that of the vault would be a strong lateral thrust as well as vertical pressure, and these were to be provided for. We shall see presently that all the real beauties of this most interesting work were the outcome both of the needs of practical structure and the requirements of ritual and a ceremonial expression of the liturgy.

THE CLERESTORY, NORTH SIDE OF NAVE.

      It is not possible for us to discover exactly when the several parts of the work undertaken after the fire of 1186–1187 were begun, nor when they were finished. Of dates we have little knowledge, except that of the dedication in 1199, the fall of two towers in 1210, and the various indications of architectural activity at certain periods given by the several dates mentioned in connection with donations, bequests, and royal sanctions in the episcopal statutes and other documents. These nearly all show that the time of greatest activity was after 1186 and before 1250. If such a feat as has been mentioned was performed at Canterbury between 1174 and 1184, was it not possible also at Chichester? Then it becomes necessary to assume that the structural alterations were continuing during the whole of the period suggested; and this was so. Enough work had been done by 1199 to allow of another dedication of the building. Seffrid II. had been bishop from 1180–1204, and the register of Bishop William Rede, written one hundred and sixty years later, explicitly states that Seffrid "re-edified the Church of Chichester." This is a comprehensive statement, but it might easily include at least the greater part of the vaulting with some form of external roof. Such a change as this involved the alteration of the nave and aisle piers, so that the slight vaulting shafts of finer stone might be inserted in the older masonry. The lower part of each of the piers of the nave arcade on the side towards the centre of the church was re-faced with the same material, and smaller shafts of Purbeck marble were introduced upon the piers, replacing probably the heavy ones of an earlier date. These shafts formed the support to a more delicate moulded member, which was now substituted for the original and very simple outer order of the original arch. A string-course of Purbeck marble was inserted as a line of separation between the nave arcade and the triforium, and also between the triforium and clerestory. The triforium itself remained as it had been before 1186; but the clerestory was dressed again, so that it obtained quite a new character. It was re-faced with the fine-grained stone, and the slight shafts which supported the clerestory arcades were provided with Purbeck capitals and bases. This arcading itself was also changed from its earlier type. The central arch was still made round in form, but those on either side of it were each pointed, and all were more finely moulded than before. Above this point rises the new stone vault, which is carried upon a framework of strong transverse and diagonal ribs. Between these the shell, or filling, which formed the surface of the vault, is of chalk, roughly cut and irregularly laid; above this was placed a thick coat of concrete.

      Some flying-buttresses were built now in order to meet the thrust exerted by the new arched vault of the nave. These were constructed in two series, one being concealed under the sloping roof over the triforium and acting in place of the earlier round-arched abutment. Its supports were provided at the points where the transverse and diagonal arches of the nave vault began to spring away from the vertical plane of the walls. The other series was the immediate counter-poise to any direct thrust exerted by the arching of the vault against the upper section of the same walls. There was, in fact, a large buttress added to