Bell's Cathedrals: The Cathedral Church of Chichester (1901). Hubert C. Corlette

Bell's Cathedrals: The Cathedral Church of Chichester (1901) - Hubert C. Corlette


Скачать книгу
that point from which each set of vault-carrying ribs began to rise. This buttress, though apparently sub-divided, was one thing, but of composite structure. It was pierced first by the aisle, next by the triforium, and then again above the roof of the triforium. It will be seen that most of these alterations were the direct result of the introduction of a stone vault. But the almost entire renewal of the eastern part of the cathedral was made possible by the destruction and total removal of the apsidal terminations of the earlier work. It has been suggested that the fire may have so badly damaged this portion as to allow no alternative but rebuilding. What may have been the actual cause of its removal it is impossible for us now to know; but the substitute is quite a perfect piece of work of its kind. This ambulatory, or presbytery, as it is commonly misnamed, was nearly all newly built from the foundations during the first half of the thirteenth century. The continuation of the arcade, the triforium, the clerestory, and the vault, the vaulting of the aisles and the chapels forming their terminations eastwards—all this, with the new arch at the entrance to the earlier lady-chapel, was work of the same date.

PIER-CAPITALS IN THE RETRO-CHOIR.

      Some new buttressing had been added to the south-west tower when the upper part of the tower itself was rebuilt; but the larger works were the addition of a vaulted sacristy in the corner between the west side of the south end of the transept and the nave. On the opposite side of the same part of the transept a square-ended chapel with a vestry attached was added in place of the original shallow apsidal chapel. The original chapel on the east side of the north end of the transept was also removed to make way for another and much larger one. This is now used as the cathedral library.

      The scheme planned after the second fire having been completed by about the middle of the thirteenth century, little further work was undertaken in comparison with that then finished; but before 1250 the wall of the south aisle of the nave was pierced in four bays, and two more chapels were added. Then, on the north of the nave, the outer wall of the aisle was cut through in the second bay, going west from the transept, and a small chapel was built. The other chapels west of this one were added during the latter half of the century. In each case the deeply projecting buttresses which had been introduced against the earlier walls after the second fire were used, where they were available, to form parts of the masonry of these new chapels, and were therefore not disturbed unnecessarily. The old walls having been altered, and the earlier buttresses being changed in their nature, it became necessary to carry the original thrust from the nave still farther out from its source in order to find for it some satisfactory abutment, and in doing this there was that new force, introduced by the vaulting of these added chapels, to be reckoned with in addition. Consequently, to the earlier buttressing more was added. The exact nature and the approximate date of this work are shown by Professor Willis in the sections and plan given in his monograph on the cathedral. The addition to each buttress amounted to an elongation of it as a pierced wing wall which provided lateral support. Upon the end of it a greater mass of masonry was introduced to serve as a weight for steadying the structural device; and this necessary structural idea was the means of introducing another architectural feature—the pinnacle. Between the pinnacles of these buttresses rose the gabled ends of each of the chapels. Professor Willis suggests that a great part of the work done after the fire of 1186–1187 was completed by the time of the dedication ceremony in 1199, and he is no doubt a safe authority to follow. But the nature of many architectural features tends very strongly to confirm the idea that much of the work in the ambulatory eastward of the sanctuary had been delayed. It may have been that the activity which prevailed during the early half of the thirteenth century was caused by the desire to see this portion of the church completed; and the energy with which the plea for new interest and further funds was urged at this time would no doubt be indicative of a supervening lethargy following on the great effort necessary for the completion of so much in these few years. But it should be remembered that these great works of mediæval art were none of them built in a day; they represented the accumulation of even centuries of developing thought and continually improving skill. Therefore must we realise that after this fire had occurred in 1186–1187 not more than eleven or twelve years elapsed before the building was again in use after the consecration in 1199.

      Note.—For remarks on Chichester Cathedral, see Archaeologia, xvii., pp. 22–28: "Observations on the Origin of Gothic Architecture." By G. Saunders, 1814.

TRANSVERSE SECTIONS FROM WILLIS ARCHITECTURAL HISTORY.

      This process of reconstruction shows that the mediæval builders did not restore in duplication of what had been lost. Where their work was destroyed they built anew and improved upon what had gone.

      We need not suppose that this repair, renewal, and addition had all been completed when in 1199 Bishop Seffrid II. and six other bishops again consecrated the church. Doubtless only so much had been done as was necessary to enable the priests to officiate at an altar provided for the purpose and the congregation to assemble within the walls; for the work of building continued with a somewhat persistent manifestation of energy throughout the whole of the thirteenth century. Of this activity and enterprise there are many evidences in proof, both documentary and structural. The documentary evidence indicating the activity which prevailed after this date is sufficient to show at least that much was being done; but it does not often indicate in precise terms what is that particular portion of the building to which it primarily refers. Early in the thirteenth century (1207) the king gave Bishop Simon de Welles (1204–1207) his written permission to bring marble from Purbeck for the repair of his church at Chichester. He attached to this act of favour certain conditions which were to prevent any disposal of the material for other purposes.

      John had also two years before given Bakechild Church to the "newly-dedicated" cathedral. Then Bishop Neville, or Ralph II. (1224–1244), at his death in 1244, "Dedit cxxx. marcas ad fabricam Ecclesiae et capellam suam integram cum multis ornamentis." Walcott adds that "his executors, besides releasing a debt of £60 due to him and spent on the bell tower, gave £140 to the fabric of the Church, receiving some benefit in return." This cannot be interpreted as referring to the isolated tower standing apart to the north of the west front; for, as we shall see, this was not erected until at least one hundred and fifty years later. In 1232 "the dean and chapter gave of their substance. During five years they devoted to the glory and beauty of the House of the Lord a twentieth part of the income of every dignity and prebend"; 3 and then, again, ten years after the period covered by this act of the chapter the bishops of some other sees granted indulgences on behalf of the fabric of the church at Chichester. Bishop Richard of Wych (1245–1253) "Dedit ad opus Ecclesiae Circestrensis ecclesias de Stoghton et Alceston, et jus patronatûs ecclesiae de Mundlesham, et pensionem xl. s. in eadem." 4 To this he added a bequest of £40. He had revived in 1249 a statute of his predecessor, Simon de Welles, and extended "the capitular contribution to half the revenues of every prebend, whilst one moiety of a prebend vacant by death went to the fabric and the rest to the use of the canons." Other means were used to provide funds to continue the work.

      But apart from these many indications of activity, the fabric as it stands to-day speaks very clearly of the amount of building that went on between 1200 and 1300. But it was not till 1288–1305 that Bishop Gilbert de S. Leophardo had added the two new bays of the lady-chapel eastward.

      The fire was the direct cause of most of the work that was done. There was another, however; for eleven years after the re-dedication, two of the towers fell. It has been supposed by some that these must have been the early towers of the west front, both of which still preserve indications of having been begun during the twelfth century as part of the original building scheme. It is probable, for reasons that will appear later, that the two towers of the west front did not collapse at the time of the second fire, although it would seem from the Chronicle of Dunstable that their stability may have been impaired in some measure, since the sole cause for this fall of towers is given in the words "impetu venti ceciderunt duae turres Cicestriae." 5 But if these towers had been affected, what of the original central tower? Its risk of receiving serious damage would be far greater. That no more than the upper story of one of these can have fallen is evident from the fact that the south-western


Скачать книгу